The flooring in the cafeteria and main school entrance is cracking and worn and needs asbestos abatement and replacement. This project is too large to be covered in the district's annual capital improvement budget.
Another example of flooring that needs to be replaced.
The district's old septic system needs replacement after it was removed from the 2017 referendum project list. The side door needs repairs and security improvements to become the main entrance for the elementary school.
Closeup of the septic system
The Door 3 entrance needs repair and renovations, including security upgrades, to convert it to a main entrance for the elementary school.
The Jr/High School classrooms hallway and classroom floors need replacement and asbestos abatement. The Family and Consumer Sciences (FACS) area have original doors and cabinetry from the 1950s, limited space and need modernization to a 21st Century FACS trade space.
The Family and Consumer Sciences (FACS) area have original doors and cabinetry from the 1950s, limited space and need modernization to a 21st Century FACS trade space.
Classrooms in the Jr/High School area need floor replacement, asbestos abatement and more room for student learning.
The referendum would fund large maintenance projects such as electrical main upgrades that can not be funded in the district's annual capital improvement budget.
The referendum would fund large maintenance projects such as electrical main upgrades that can not be funded in the district's annual capital improvement budget.
The high school side entrance - door 21 - needs door replacement and security improvements. This is the door that 4H students enter in the back of the building by the bus garage.
Doors and entrances need improvements and security upgrades